Ten leaks located over a six-year period on a ship-to-shore pipeline that needed to stay in service
Introduction
A product transfer pipeline is the last mile between a tanker and a refinery. It is usually short, usually old, and usually the only route the product can take. When it leaks, the transfer stops, and every day the pipeline is down results in costly delays that cannot be recovered.
Three factors make these pipelines both prone to leaking and difficult to inspect. Intermittent service means the pipeline holds a static inventory between vessel calls, frequently sea water for pressure containment, so it spends much of its life in stagnant conditions that favour internal corrosion. An inaccessible alignment means shore crossings and submerged sections cannot simply be dug up; verification needs dredging, tidal windows, and marine support, which makes a wrong dig location expensive. Legacy construction means the pipeline is often the oldest asset on the terminal, assembled over decades from sections of differing diameter and wall thickness that conventional in-line inspection tools sized for a single bore cannot pass.
Project description

The pipeline is 5,949 meters of carbon steel connecting a marine terminal to a refinery in Brazil. It was built in sections of 14, 16, 20, and 22 inch diameter with wall thicknesses between 9.5 and 26.3 millimeters, and the oldest section has been in service since the 1950s. Part of the alignment runs offshore, buried in shallow water. The refinery transfers product from arriving tankers to its port facility through this pipeline and keeps it pressurized with sea water between vessel calls to maintain containment. A leak halts the transfer of product at an estimated cost to the client of nearly USD25,000 per day. INGU’s partner Orion SIC supports the client locally.
Operational description
Pipers® are held in stock at the terminal, so an inspection begins when the client suspects a leak rather than when a crew can be mobilized. Two Pipers® are inserted and travel with the flow, which allows every reported location to be checked for repeatability between the two runs. The pipeline remains pressurized throughout, with maximum pressures between 88 and 132 psi recorded during the inspections. A preliminary location of a suspected leak is emailed within two working days of the data reaching INGU, allowing the refinery to take immediate action and get the pipeline in operation again for the next ship to offload.
The Pipers® solution
INGU’s Pipers® solution pairs a baseball-sized free-floating multi-sensor system with AI powered data analytics and a GIS Pipeline viewer. The Pipers® solution accurately identifies and locates potential issues such as leaks, deposits, and changes in the pipeline wall that threaten pipeline health.
For leak detection, Pipers® carry an acoustic sensor. While moving through a pipeline, Pipers® continuously record the relatively quiet flow noise, which establishes a baseline for the measured sound intensity. Passing a leak, the recorded level rises above that baseline: the amplitude increases as the Piper approaches the leak, reaches a maximum at the leak, and decreases as the Piper moves downstream, producing a symmetrical signature that extends into the higher frequency domain near its center. Because Pipers® travel with the product rather than sealing against the wall, they pass changes in diameter and are not sized to a single bore.
Results

Since the first inspection in 2020, Pipers® have been deployed on this pipeline more than twenty times. Ten reported leak locations have been excavated and confirmed by the client. One of those locations turned out to hold two adjacent leaks, on either side of a girth weld, giving eleven confirmed leaks in total. Confirmed leak diameters ranged from 2.1 to 8.2 millimeters.
In each case the client excavated at a location Pipers® had reported, rather than searching the pipeline for it. On an alignment that runs through shallow water and across a shore crossing, that is the difference between opening the ground once and opening it repeatedly. Repairs were made by welding, by half-cane sleeve, and in two cases by replacing the affected section.
Pipeline specifications
Pipeline Length | 5,949 meters |
Pipeline Diameter | 14 to 22 inch |
Wall thickness | 9.5 to 26.3 mm |
Pipeline Material | Carbon steel |
Content | Product and sea water |
Location | Brazil |